North American experience · Southeast Asian focus
AI data-center development. From power to operations.
Distributed Global Computing takes an AI data center from the site and the power through design, equipment, installation, commissioning, and operations.
About
Assess, design, power, cool, install, commission, and operate.
The scope is the data center itself: the site and its feasibility, the power, the cooling, the equipment and suppliers, installation and commissioning, and operations and maintenance.
About DGCCapabilities
Six parts of the same data center.
01
Site and feasibility
Whether a location can carry an AI data center: land, access, climate, and the path to a buildable plan.
02
Power
The electrical supply, the interconnection, and the capacity the computing load will actually draw.
03
Cooling
Site conditions, water and energy, system interfaces, and a cooling path that can be maintained.
04
Equipment and suppliers
The IT equipment, the plant, and the suppliers that have to fit the site and the schedule.
05
Installation and commissioning
Receiving, installation, and a witnessed bring-up before the data center is called live.
06
Operations and maintenance
The operating practice after service: spares, monitoring, and the work that keeps the load online.
Experience
North American experience. Southeast Asian focus.
- Team experience Canada Team experience in Canada.
- Team experience New York State Team experience in New York State.
- Development and partnerships Southeast Asia The current business direction: development and partnerships. This is not a record of completed projects.
Power partners
Power and sites, from the people who hold them.
Electricity providers, energy developers, and site owners can introduce a location and the power that comes with it.
Power partnersContact